Int. log. Box Tracking — line 2 / shift B

Acknowledge all

Instructions visualisation

Forklift delivery / dolly loading

ANDONKANBANNAMEBUFFERRUN OUT TIMEP LANEDOLLY DELIVERY / DD ADDRESSDOLLY TYPE / POSITIONLEAD TIMEActions
CriticalKB-40218Front bumper assy LH2 / 1200:07P-14DD-114 / Bay 3Type C / Pos 218 min
CriticalKB-40219Front bumper assy RH3 / 1200:11P-14DD-114 / Bay 3Type C / Pos 318 min
WatchKB-40771Rear door trim panel6 / 1600:24P-07DD-092 / Bay 1Type A / Pos 125 min
WatchKB-40772Rear door trim clip set7 / 1600:26P-07DD-092 / Bay 1Type A / Pos 425 min
NominalKB-41055Instrument cluster harness11 / 1401:02P-22DD-201 / Bay 6Type B / Pos 140 min
NominalKB-41056Console side garnish12 / 1401:15P-22DD-201 / Bay 6Type B / Pos 540 min
NominalKB-41310Wheel arch liner FR9 / 1001:41P-31DD-256 / Bay 2Type A / Pos 352 min

Confirm each dolly against its P lane before releasing the forklift. Run-out times are counted from the last scan at the buffer gate.

Toyota forklift in a warehouse aisle

Dollies staged

14

Awaiting scan

3

Overdue

2

Toyota forklift in a warehouse aisle
Raster, no srcset
MANOS app mark
Raster, line art
Toyota
Vector