Instructions visualisation
Forklift delivery / dolly loading
| ANDON | KANBAN | NAME | BUFFER | RUN OUT TIME | P LANE | DOLLY DELIVERY / DD ADDRESS | DOLLY TYPE / POSITION | LEAD TIME | Actions |
|---|---|---|---|---|---|---|---|---|---|
| Critical | KB-40218 | Front bumper assy LH | 2 / 12 | 00:07 | P-14 | DD-114 / Bay 3 | Type C / Pos 2 | 18 min | |
| Critical | KB-40219 | Front bumper assy RH | 3 / 12 | 00:11 | P-14 | DD-114 / Bay 3 | Type C / Pos 3 | 18 min | |
| Watch | KB-40771 | Rear door trim panel | 6 / 16 | 00:24 | P-07 | DD-092 / Bay 1 | Type A / Pos 1 | 25 min | |
| Watch | KB-40772 | Rear door trim clip set | 7 / 16 | 00:26 | P-07 | DD-092 / Bay 1 | Type A / Pos 4 | 25 min | |
| Nominal | KB-41055 | Instrument cluster harness | 11 / 14 | 01:02 | P-22 | DD-201 / Bay 6 | Type B / Pos 1 | 40 min | |
| Nominal | KB-41056 | Console side garnish | 12 / 14 | 01:15 | P-22 | DD-201 / Bay 6 | Type B / Pos 5 | 40 min | |
| Nominal | KB-41310 | Wheel arch liner FR | 9 / 10 | 01:41 | P-31 | DD-256 / Bay 2 | Type A / Pos 3 | 52 min |
Confirm each dolly against its P lane before releasing the forklift. Run-out times are counted from the last scan at the buffer gate.

Dollies staged
14
Awaiting scan
3
Overdue
2

